Please use this identifier to cite or link to this item:
https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/8038
Title: | Proposed Interim Operating Procedures for Lake Victoria Storage Background Paper No 9 October 1997 |
Authors: | Murray Darling Basin Commission |
Keywords: | Scanned Files |
Issue Date: | 1997 |
URI: | https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/8038 |
Appears in Collections: | Murray Darling Basin Commission [1988-2008] |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Proposed Interim Operating Procedures for Lake Victoria Storage Background Paper No 9 October 1997.pdf | Proposed Interim Operating Procedures for Lake Victoria Storage Background Paper No 9 October 1997.pdf | 11.93 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.