Please use this identifier to cite or link to this item:
https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/23425
Title: | Peak Demand Reduction Scheme : Rule change 2 update |
Other Titles: | Peak Demand Reduction Scheme : Rule change 2 update September 2024 |
Authors: | Department of Climate Change, Energy, the Environment and Water |
Keywords: | Net zero plan;Energy security safeguard;Electric power consumption;Electricity;Electric power distribution -- Economic aspects;Energy Security Safeguard scheme;Position Paper |
Issue Date: | 2024 |
Publisher: | NSW Department of Climate Change, Energy, the Environment and Water |
Series/Report no.: | Peak Demand Reduction Scheme |
Abstract: | This paper highlights additions and amendments to the Rule following additional consultation. It responds to the additional feedback on the new battery activities by outlining: • industry feedback and how we have responded • changes to new activities in the Rule • minor amendments to activities in the Rule. The paper covers: • stakeholder concerns over the start date for battery activities, the maximum size of permitted battery installations and the ability to add a second battery • changes to warranty requirements for both battery activities, BESS1 and BESS2, with additional context relating to energy throughput and temperature range |
Description: | September 2024 |
URI: | https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/23425 |
ISBN: | 978-1-923285-48-4 |
Appears in Collections: | Department of Climate Change, Energy, the Environment and Water [2024-present] |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Peak_Demand_Reduction_Scheme_Rule_Position_Paper_rule_change_2_update.pdf | 563.58 kB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.