Please use this identifier to cite or link to this item: https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/9684
Full metadata record
DC FieldValueLanguage
dc.date.accessioned2023-06-22T08:03:09Zen
dc.date.available2023-06-22T08:03:09Zen
dc.date.issued1972en
dc.identifier.govdoc26698en
dc.identifier.urihttps://nswdpe.intersearch.com.au/nswdpejspui/handle/1/9684en
dc.source/mnt/conversions/nswdpe/20220727_1_DPIE 4 Parramatta Square (128 boxes)//Scanned Files/Box 89/The Feasibility of Flood Mitigation Works at Hexham in the Lower Hunter Valley.pdfen
dc.titleThe feasibility of flood mitigation works at Hexham in the lower Hunter Valleyen
dc.contributor.corpauthorALLAN PATTISON and ASSOCIATESen
dc.contributor.corpauthorDepartment of Public Worksen
dc.identifier.barcodeThe Feasibility of Flood Mitigation Works at Hexham in the Lower Hunter Valley.pdfen
Appears in Collections:Department of Public Works [II] [1941-1995]

Files in This Item:
File Description SizeFormat  
The Feasibility of Flood Mitigation Works at Hexham in the Lower Hunter Valley.pdfThe Feasibility of Flood Mitigation Works at Hexham in the Lower Hunter Valley.pdf30.36 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Google Media

Google ScholarTM

Who's citing