Please use this identifier to cite or link to this item: https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/5434
Title: Draft floodplain management plan : Wakool River stage 2 Moama - Moulamein railway to Gee Gee Bridge
Authors: Department of Environment, Climate Change and Water
Keywords: Floodplain management;Flood control;Flood damage prevention
Issue Date: 2010
Publisher: DECCW NSW,
Description: Bibliography: p. 53.
Cover title.
"March 2010".
"DECCW 2010/100"--Verso cover.
"This Stage 2 Floodplain Management Plan (Stage 2 FMP) has been prepared to provide strategic guidance for the NSW government agencies and landholders involved in managing floodwaters on the Wakool River (Moama–Moulamein Railway to Gee Gee Bridge) floodplain."--P. 1.
Also available online. On 12/03/10 freely available from the wesbsite of DECCW NSW at: http://www.environment.nsw.gov.au/ruralfloodplains/fmp/edwardwakool.htm.
"Funding for the Edward and Niemur Rivers stage 3 floodplain management plan was provided by the Commonwealth Natural Disaster Program with financial support from the state."--Verso cover.
Internal ID Number: 24944
URI: https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/5434
ISBN: 9781742322650
Appears in Collections:Department of Environment, Climate Change and Water [2009 -2011]

Files in This Item:
File Description SizeFormat  
Draft Floodplain Management Plan Wakool River Stage 2 Moama - Moulamein Railway to Gee Gee Bridge.pdfDraft Floodplain Management Plan Wakool River Stage 2 Moama - Moulamein Railway to Gee Gee Bridge.pdf51.84 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Google Media

Google ScholarTM

Who's citing