Please use this identifier to cite or link to this item: https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/1257
Full metadata record
DC FieldValueLanguage
dc.contributor.authorA. G. Review-
dc.date.accessioned2023-06-21T09:57:03Z-
dc.date.available2023-06-21T09:57:03Z-
dc.date.issued1965-
dc.identifier.urihttps://nswdpe.intersearch.com.au/nswdpejspui/handle/1/1257-
dc.description.abstractMobile diesel equipment has been used underground on the C.S.A. Project at Cobar since the inception of lateral development on the 1200 ft. level, about the beginning of November, 1963. The following is a progress report in so far as the Mines Inspection Act is effected.-
dc.relation.ispartofseriesMines Inspection report-
dc.source/mnt/conversions/nswdpe/20220815_1_DPIE//Scanned Files/Box 1/Mines Inspection Report No 5 Diesel Operation Underground at Cobar Preliminary Review.pdfen
dc.subjectMine Inspection reporten
dc.subjectPreliminary Reviewen
dc.subjectdiesel equipment Cobar-
dc.subjectMine air quality-
dc.subjectMine health and safety-
dc.titleDiesel Operation Underground at Cobar Preliminary Reviewen
dc.title.alternativeMines Inspection Report No 5-
dc.typepdfen
dc.contributor.corpauthorDepartment of Mines-
Appears in Collections:Department of Mines [II] [1908-1978]

Files in This Item:
File Description SizeFormat  
Mines Inspection Report No 5 Diesel Operation Underground at Cobar Preliminary Review.pdfMines Inspection Report No 5 Diesel Operation Underground at Cobar Preliminary Review.pdf4.34 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Google Media

Google ScholarTM

Who's citing