Please use this identifier to cite or link to this item:
https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/1257
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | A. G. Review | - |
dc.date.accessioned | 2023-06-21T09:57:03Z | - |
dc.date.available | 2023-06-21T09:57:03Z | - |
dc.date.issued | 1965 | - |
dc.identifier.uri | https://nswdpe.intersearch.com.au/nswdpejspui/handle/1/1257 | - |
dc.description.abstract | Mobile diesel equipment has been used underground on the C.S.A. Project at Cobar since the inception of lateral development on the 1200 ft. level, about the beginning of November, 1963. The following is a progress report in so far as the Mines Inspection Act is effected. | - |
dc.relation.ispartofseries | Mines Inspection report | - |
dc.source | /mnt/conversions/nswdpe/20220815_1_DPIE//Scanned Files/Box 1/Mines Inspection Report No 5 Diesel Operation Underground at Cobar Preliminary Review.pdf | en |
dc.subject | Mine Inspection report | en |
dc.subject | Preliminary Review | en |
dc.subject | diesel equipment Cobar | - |
dc.subject | Mine air quality | - |
dc.subject | Mine health and safety | - |
dc.title | Diesel Operation Underground at Cobar Preliminary Review | en |
dc.title.alternative | Mines Inspection Report No 5 | - |
dc.type | en | |
dc.contributor.corpauthor | Department of Mines | - |
Appears in Collections: | Department of Mines [II] [1908-1978] |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Mines Inspection Report No 5 Diesel Operation Underground at Cobar Preliminary Review.pdf | Mines Inspection Report No 5 Diesel Operation Underground at Cobar Preliminary Review.pdf | 4.34 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.